注塑模具厂家接收模具时常见问题

来源:http://www.sdlqmj.com/ 日期:2022-07-28

在注塑模具厂家在验收模具的时候,要注意一些常见的问题,这里小编来详细介绍下。
In the acceptance of injection mold manufacturers, we should pay attention to some common problems. Here is a detailed introduction.
由于验收模具过程中总是伴随着某些风险,任何可以想象得到的、都可能发生的情况我们事前都要进行风险评估。应该关注模具的复杂程度、备件的关键特性、配件的后处理质量、以及在移动模具过程中任何可预见的突发性风险。
As there are always some risks in the process of mold acceptance, we must conduct a risk assessment in advance for any conceivable and possible situation. The focus should be on the complexity of the mold, the key characteristics of spare parts, the aftertreatment quality of accessories, and any foreseeable sudden risks in the process of moving the mold.
若评估发现后得出了较高的风险系数,则收货前越需要做详细的搬运前准备工作。收到货后应该尽量避免发生模具损坏,导致停工停产,对注塑生产业务经营造成负面影响等情况。
If a higher risk coefficient is obtained after the evaluation, the more detailed preparations need to be made before receiving the goods. After receiving the goods, we should try our best to avoid mold damage, resulting in downtime, which will have a negative impact on the operation of injection molding production business.
济南注塑加工厂家认为应该观察一套模具加工的运转情况,包括检查模腔的状况、循环时间、制模工艺条件,不可思议的四点就是进行价值评估。
Jinan injection molding manufacturers believe that they should observe the operation of a set of mold processing, including checking the condition of the mold cavity, cycle time, and molding process conditions. The incredible four points are value evaluation.
济南注塑加工
如果模具正处于不是正处于运转当中,尤其模具已经长时间停用的情况下,在模具准备移送之前,需行试加工,评估该套模具的使用价值。
If the mold is in operation or not, especially when the mold has been out of service for a long time, it is necessary to carry out trial processing before the mold is ready for transfer to evaluate the use value of the set of molds.
对保留下来的试样件尽可能了解到部分信息,但更多的详细情况就不可能知道了。可能没有了解到实际生产时的工艺条件,或者不知道经过修正的工艺参数。循环时间不能通过推断来判定,特殊的辅助设备仪器可能没有被提醒注意。
Try to know some information about the retained samples, but it is impossible to know more details. You may not know the actual production process conditions, or you may not know the corrected process parameters. The cycle time cannot be determined by inference, and special auxiliary equipment and instruments may not be reminded.
如果模具在加工某个部件只是应用了这套模具中的部分型腔,而不是模具在满型腔注射的运转状态的话,那么发给客户看的各个数据的加工参数就理所当然地值得怀疑。
If the mold only applies part of the cavity in the mold when processing a certain part, rather than the operation state of the mold injected in the full cavity, then the processing parameters of various data sent to the customer for viewing are naturally questionable.
在卖家交送模具之前,在注射机上满型腔注射状态下进行试运转,以便于检测模具的各个产品质量。更多相关内容就来我们网站http://www.sdlqmj.com看看吧。
Before the seller delivers the mold, the test run shall be carried out under the full mold cavity injection state on the injection machine, so as to test the quality of each product of the mold. Come to our website for more relevant content http://www.sdlqmj.com Take a look.